Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
TENOVA I2S inks supply agreement with Olympic Steel Inc
107 times viewed.
Sunday, 19 Dec 2010
EmailButton
Pdf_button

Tenova I2S announced that it has recently signed a contract with Olympic Steel Inc to supply a 444 & 1067 x 2134mm 4 High Temper Mill at the company's planned new site at US Steel's Gary Works plant in Gary in Indiana.

The new Tenova I2S Mill will be the third Temper Mill supplied to Olympic Steel Inc. The first two Temper Mills are located at Olympic Steel Inc facilities in Cleveland, Ohio and Bettendorf, Iowa and have been in operation for over a decade.

The new Tenova I2S Mill will be placed in a cut to length line which will produce over 150,000 tonnes per annum of high quality tempered sheet. The Tenova I2S Mill is equipped with the latest automation and control systems and includes Tenova I2S Automatic Elongation Control and I2S Thickness Gauges.

The new Tenova I2S 444 & 1067 x 2134mm 4 High Temper Mill produces high quality sheet steel from 1.0mm to 10.0mm thickness and width range of 610mm to 1900mm.

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
More International News
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru