Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
Selwyn continues to confirm Don Deposit mineralization
111 times viewed.
Sunday, 24 Jul 2011
EmailButton
Pdf_button

Selwyn Resources Limited announced additional drill results from the drilling of the 62 lens of the Don deposit at Selwyn Project, Yukon Territory. The drill results are part of the definition drilling program in the Don deposit that is being conducted by Selwyn Chihong Mining Limited.

The JV Company equally owned by Selwyn and Chihong Mining Canada Limited, Chihong Mining Canada Limited is a wholly owned subsidiary of Yunnan Chihong Zinc and Germanium Company Limited.

Highlights: 62-lenses of the Don Deposit;
1. DON-163 intersected 6.83 meters true thickness grading 6.71% zinc and 3.71% lead including 2.45 meters grading 10.08% zinc and 2.72% lead;

2. DON-167 intersected 8.15 meters true thickness grading 7.41% zinc and 3.24% lead including 0.93 meters grading 21.54% zinc and 13.62% lead and

3. DON-174 intersected 10.28 meters true thickness grading 6.30% zinc and 3.08% lead including 1.55 meters grading 10.95% zinc and 9.76% lead.

62-Lens Drill Results;
The high grade mineral resource for the Don deposit undertaken to NI 43-101 standards is composed of three lenses in the underground environment, each of which is structurally bounded by faults. The three main lenses are the 61-lens, 62-lens and the 63-lens.

Drill hole DON-163 intersected high grade, zinc lead mineralization in the near-surface environment from 67.80 to 79.50 meters for a true thickness of 6.83 meters grading 6.71% zinc and 3.71% lead including 2.45 meters grading 10.08% zinc and 2.72% lead.

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
More Metals News
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru