Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

December 02, 2008


IOC to increase pipeline capacity by March 2008

Mr Dinsha Patel union minister of state for petroleum & natural gas informed parliament recently that Indian Oil Corporation is planning to increase pipeline capacity from 61.718 million tonnes per annum as on March 31st 2007 to 75.480 million tonnes per annum by March 31st 2008.

The details of capacity addition and approved cost are as under

SlPipeline NameCapacityCost
1Paradip-Haldia Crude Oil Pipeline111178
2Koyali-Ratlam Product Pipeline2224.69
3Aviation Turbine Fuel Pipeline0.1848.58
4Bongaingaon-Siliguri Pipeline 0.58228.61
Capacity in million tonnes per annum
Cost in INR crores