Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

December 02, 2008


ZSMK Launches Reconstructed Bf No 1

FIS REPORTED THAT The Western Siberia Metal Integrated Works HAS put into operation after the first degree capital overhaul the blast furnace No 1.

Upon its startup the combine increased the total production of cast iron, The specific productivity of the blast furnace has grown and coke and energy consumption per ton of cast iron have decreased. During the reconstruction the old blast furnace was dismantled and a new case and aggregate equipment have been assembled.