Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

October 12, 2008


PGCIL inks JV with REL to execute transmission lines

Power Grid Corporation of India Limited announced that it has entered into a 26:74 JV agreement with Reliance Energy Limited to execute 300 kilometer long transmission lines from Parbati to Koldam and Koldam to Ludhiana.

The above lines are part of elements of the transmission system associated with generation projects like Parbati II hydroelectric project and Koldam hydroelectric project.

NHPC is establishing 800 MW Parbati II hydroelectric projects and NTPC is establishing 800 MW Koldam hydroelectric projects in the state of Himachal Pradesh.