Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

December 04, 2008


Steel shop reduces downtime 88% with software

It is reported that Sterling Steel, a manufacturer of wire rod for its parent company Leggett & Platt, has increased throughput and reduced downtime at its plant at Sterling in Illinois, using the Ivara EXP reliability software solution from Ivara Corp, a provider of asset reliability solutions based at Burlington in Ontario.

As per report, by using EXP, Sterling realized significant improvements in asset performance, including an 88% reduction in downtime at the company’s rod mill and a 30% increase in melt shop throughput.

Ivara helped Sterling gain control over equipment failure. By implementing Ivara EXP enterprise software, Sterling was able to bring together a wide range of equipment condition data, including maintenance inspections, operator rounds and online information. Sterling now has a complete picture of its equipment health and performance online in real time E.

Mr Kevin Mullen plant maintenance manager of Sterling Steel said that “Ivara provided us with a solution that has allowed us to adopt a proactive business process for maintenance. We’ve not only increased throughput levels, but we’ve implemented a maintenance strategy that is aligned with our business goals.”