Sglogo_1

 

Events Reports Directory Forum Articles Job Post Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

September 08, 2008


Tenova LOI to supply a new reheating furnace to Trametal

LOI Italimpianti has signed a contract with Italy’s Trametal SpA for the supply of a 100 tonne per hour reheating furnace to be installed at S Giorgio di Nogaro Plant in Italy. The contract will be managed by the Italian office of LOI Italimpianti based in Genoa. The start up of the furnace will be within September 2008.

LOI Italimpianti will provide a turn key furnace equipped with a three ways pusher bottom and top fired. The combustion system is a regenerative type with preheated combustion air and is designed for firing natural gas through LOI Italimpianti in house developed FlexyTech ® Low NOx burners.

The contract’s scope of supply will also include a charging table and the charging/discharging handling system necessary to connect the furnace with the quarto reversing rolling mill.

Trametal is one of the major companies of the Malacalza Group, operating in plate mill is expected to considerably increase its productivity with this new facility.