Sglogo_1

 

Events Reports Directory Forum Articles Job Post Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

October 07, 2008


ONGC to supply fuel for NEEPCO plant

It is reported that ONGC will supply natural gas to the North Eastern Electric Power Corporation Limited for its power generation plant in Tripura.

As per report, ONGD has signed a term sheet, which is a precursor to signing a contract for supply of 0.5 million standard cubic meters of gas per day from future exploratory efforts of ONGC’s to NEEPCO’s power generation plant at Monarchak in West Tripura.

NEEPCO plans to produce 104 MW of power by end 2010.