December 03, 2008
ABB bags major contract from DUBAL
The leading power and automation technology group ABB has won a USD 53 million contract from Dubai Aluminum Company Limited to upgrade electrical and automation systems at the company’s 480 hectare smelter complex in Dubai. Commissioning of the new units is scheduled for completion in late 2009.
Under the terms of the contract, ABB will replace 16 high voltage regulating transformers with five larger units, rated at 86 megavolt amperes, to increase capacity and combine two smelting potlines. ABB will provide design, installation and commissioning services for the project, and dismantle the existing equipment. The delivery includes control and protection systems, 250 kilo ampere field oriented measuring equipment, and upgrades to existing high voltage cables, low voltage and control cables, fire detection and fire fighting equipment.
Mr Veli-Matti Reinikkala head of ABB’s Process Automation division said “ABB’s comprehensive service and product portfolio gives customers like DUBAL the solutions they need to grow capacity while using energy more efficiently. Backed by extensive experience and expertise, we are a leading player in the metals industry.”
DUBAL operates one of the largest single site aluminum smelters in the world, having produced approximately 890,000 tonnes of aluminum in 2007 and is one of the largest non oil contributors to Dubai’s economy. This order follows a similar contract awarded by DUBAL in 2006. ABB was commissioned to deliver a similar scope of supply for an earlier expansion of this smelter complex.
