November 22, 2008
Laiwu Steel to overhaul H beam line in July
It is reported that Shandong Laiwu Steel plans to have a ten day overhaul of the large specification H beam production line.
The maintenance is expected to result in 30,000 tonnes of production loss.
As per report, the plant has made its plan of producing 170,000 tons sections and 40,000 tonnes of I-beam and channel, in which 60,000 tonnes for export.
