Sglogo_1

 

Events Reports Directory Forum Articles Jobs in Steel Resume Post Links Currency Archive Metal Rate Archive Glossary Import Duty Structure Incoterms 2000 Technical Info Trade Leads Currency Codes Contact Us Disclaimer Feedback Privacy Policy Site Map

 

FAIL (the browser should render some flash content, not this).

November 22, 2008


Liugang No 2 converter put into production

It is reported that Guangxi Liuzhou Iron and Steel Group 150 tonnes converter No 2 furnace formally put into production.

As per report, general manager and chief engineer of Liuzhou Iron and Steel Group and some other leaders attended the commissioning ceremony.

The No.2 converter is another important engineering project after its No 1 converter. The No.3 converter is expected to be put into operation in mid August 2008.