Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
Champion Minerals rallies on latest results from Moire Lake iron project
425 times viewed.
Saturday, 08 Oct 2011
EmailButton
Pdf_button

Toronto based Champion Minerals rallied over 5% after it announced Thursday the latest drill results from its Moire Lake iron ore project in Quebec located just east of steel giant ArcelorMittal Mont Wright Mine.

The company said drill hole LM11-12 returned 503.4 metres grading 31.2% total iron on the southeast side of the historic Lac Moire occurence.

Drill hole, LM11-16, located approximately 400 metres northeast and along strike of drill hole LM11-12 intersected 390.1 metres grading 27.6% total iron and included an interval of 237.1 metres grading 31.5% total iron. In addition, LM11-09 located roughly 400 metres northeast of LM11-16 found 383.4 metres of iron formation grading 30.3% total iron.

These three drill holes delineate approximately one kilometre of iron formation along strike, Champion said, with down-hole intersections of 383 metres to 503 metres.

Mr Tom Larsen president and CEO of Champion said "The latest results from our 2011 drill program at Moire Lake further confirm the high grade and continuity of the iron formations present on the property which is strategically located in the Labrador Trough.

He said that "The combined thickness and assay results from Moire Lake are significant and we expect the new resource estimate will identify a sizeable increase in the historical resource."

Champion said previously it plans to drill a northeast-trending linear magnetic anomaly underlying the eastern part of the Moire Lake project, where recent prospecting located outcrop containing specular-hematite and magnetite iron mineralization in zones up to 40 metres wide.

Permits are pending for this additional planned drilling, with this element of the exploration program deferred until 2012, Champion said. The final 2011 drill hole is in-progress, and is being drilled on the same section as LM11-12.

A total of 21 drill holes totaling approximately 9,325 metres will be completed in 2011 at the Moire Lake project. Champion is preparing samples for initial metallurgical tests and once the remaining assay results are received in early November, it will begin an NI 43-101 compliant resource estimate with results expected later in the fourth quarter.

The company plans to initiate a preliminary economic assessment for the Moire Lake project once the resource is completed.

(Sourced from www.proactiveinvestors.com)

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
More Raw Material News
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru