Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
Belarus BMZ to reconstruct continuous caster No 2
242 times viewed.
Thursday, 03 Mar 2011
EmailButton
Pdf_button

It is reported that Byelorussian Iron and Steel Works plans to reconstruct its continuous caster No 2, following which the unit annual capacity will increase from 856,000 tonnes to 1.2 million tonnes.

Accordingly, the reconstructed six strand machine, with a high level of automation and a casting radius increased to eight meters, will be able to produce billets with 125mm x 125mm and 140mm x 140mm cross sections, and will have equipment for both open and closed casting.

The reconstruction of BMZ's continuous caster No. 2 will be implemented by the Austria-based plant maker Siemens VAI which has said that the project will be implemented in several phases and will take a maximum of two years.

(Sourced from www.steelorbis.com)
Visit www.steelorbis.com for more

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru