Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
Metinvest to modernize plate mill at Azovstal
355 times viewed.
Saturday, 16 Jul 2011
EmailButton
Pdf_button

Metinvest the international vertically integrated metals and mining group of companies is proceeding with the active phase of the USD 63 million projects on revamping of the Heavy Plate Mill 3600 at its Azovstal Iron & Steel Works.

This also includes commissioning of the facility equipment for production of X80 and X90 high strength pipe plate of SMS Siemag make a German machine building group chosen as the general contractor and vendor of the equipment. The project is being realized within the framework of Metinvest long term modernization and reconstruction program.

According to the signed USD 20 million contracts SMS Siemag is to supply and install the technological equipment complex, including Hot Plate Leveller, Automatic Gauge Control and Automatic Metal Tracking System for revamping of the Plate Mill and to install the previously purchased Accelerated Cooling Unit and Water Treatment System.

The first equipment batch will is to be delivered in the end of July 2011.

In September 2011 operations at Plate Mill 3600 will be stopped for an overhaul during which the assembly and installation of the ACU and Hot Plate Leveller will be performed.

SMS-Siemag will provide project supervision work as well as perform personnel training. The whole production complex is to be commissioned after the overhaul in October of 2011.

Commissioning of these units will see the application of a thermal mechanical controlled process of plate production followed by controlled accelerated cooling of rolled steel, thus providing the required mechanical properties of plates without additional alloying of steel. The expected 20% reduction of the alloys content in the steel while maintaining its required strength characteristics will decrease pipe plate production costs by 3%.

Mr Enver Tskitishvili Director General of PJSC Azovstal Iron & Steel Works said "Steel rolling is one of the important directions of our production chain development. Reconstruction of the Heavy Plate Mill 3600 marks a new phase of our plant modernization. With the help of advanced technologies and equipment, we will be able to make our products less steel intensive and reduce productions costs."

Supply of higher strength pipe plate from Azovstal will allow reducing the wall thickness of SAW LD high strength line pipes manufactured at Khartsyzsk Pipe Plant for high pressure oil and gas pipelines.

Mr Aleksander Pogozhev Director of Metinvest Steel and Rolled Products Division said "The projects like this help us to retain our competitive edge and meet the changing requirements and expectations of our customers. We ought to become even more client-oriented and continue developing further."

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru