Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
OMZ Izhora completes installation of the hydraulic cleaning reactor DS-302
270 times viewed.
Sunday, 11 Dec 2011
EmailButton
Pdf_button

Izhora Plants part of the OMZ Group completed contract obligations before TAIF-NK JSC.

According to the contract, signed in November 2010, Izhora Plants committed itself not only to design and manufacture of petrochemical hydraulic cleaning reactor DS-302 but also to organize its delivery and installation to the designed position at the customer’s site.

Installation of the reactor was carried out by the service centre of Izhora Plants, involving specialized installation company. The installation was performed on the grounds of workshop #4 of the oil refining plant of TAIF-NK, JSC. Reactor, weight 212 tons, 4.800 meters in diameter and 15 meters in height, was set up on the foundation. The reactors installation to the desired position was carried out simultaneously by two automotive cranes Liebherr, lifting capacity 400 tonnes each. The work was carried out promptly and with impeccable quality.

Mr Ilya Kovalev deputy General Director for Sales and Logistics said “The first experience for Izhora Plants in an integrated approach to meet customer requirements for the supply of the petrochemical equipment was a success. We are convinced that only such approach will help us to compete confidently with the world’s leading manufacturers.”

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru