Search on
News Title
News Details
Reports/Directory
Glossary
 
Title_head
OMZ ink contract on delivery of oil processing equipment to Novokuybishevskiy refinery
214 times viewed.
Saturday, 28 Jan 2012
EmailButton
Pdf_button

OMZ concluded a contract to supply equipment for Novokuybishevskiy oil refinery which enters Rosneft.

In the framework of the contract Izhorskie Zavody part of OMZ Group will produce heavy reactor equipment for combined plant which is under construction at refinery Novokuibyshevskiy hydrocracking complex. The reactor vessel will be made of forged shells with internal cladding corrosion. Basic material is SA-336Gr.F22V steel. Surfacing will be made from 347SS steel.

The reactors will be built promptly and delivered to the construction site no later than September 2013 which will provide the launch in the framework of period indicated by the Russian government.

The composition of manufactured equipment includes vacuum gas oil hydrocracking reactor R-101 weighing 744 tons and with a height of 44.9 meters

1. Reactor of the 1st stage of hydrocracking R-102 weighing 664 tons and a height of 39.5 meters
2. Reactor of the 2nd stage of hydrocracking R- 103 weighing 547 tons and with a height of 27.6 meters and a hydrotreating reactor R-201 weighing 805 tons and with a height of 29.3 meters.

All reactors will be built supplied with internals.

Expanded Metal by Anping County Huijin Wire Mesh Co., Ltd.
Galvanized Steel by Beijing Xinruilufeng Industry and Trade Co., Ltd.
Wire Mesh Manufacturers & Suppliers
Aluminium Sheets Manufacturers & Suppliers

jspl
Stemcor
 
Disclaimer|Copyright Policy|Privacy Policy|About us|Feedback|Contact us|FAQ|Site Map|Know about SteelGuru