
Results of the OAO Almetyevsk Pipe Plant in the H1 of 2011
Almetyevsk Pipe Plant summed up the production activity in June 2011 and the first half of 2011.
The volume of production of pipes of various sizes in June 2011 was 16.1 thousand tons. Since the beginning of 2011 made 88,800 tonnes of pipe products and higher than the same period in 2010 of 7.9%.
Shipment of pipes of its own production in June totaled 16,600 tons. Since the beginning of 2011 shipped 86,900 tonnes of pipes of its own production which exceeds the 2010 level of 4.2% (83.5 tonnes).










