Peab has been commissioned to build a new swimming pool facility in Saltsjöbaden in south of Stockholm. The customer is Nacka Municipality and the contract is worth SEK 265 million. The project entails building a new swimming pool facility, Näckenbadet, doing the associated groundwork and tearing down the existing swimming pool facility. It will be built on two floors and contain a 25 meter pool with six swimming lanes, a training pool with a height adjustable bottom and personnel space.The project is a traditional contract with some turnkey contract parts. The building will correspond to the level of Miljöbyggnad Silver. Construction will start in February 2023 and occupation is planned for 2025.
Peab has been commissioned to build a new swimming pool facility in Saltsjöbaden in south of Stockholm. The customer is Nacka Municipality and the contract is worth SEK 265 million. The project entails building a new swimming pool facility, Näckenbadet, doing the associated groundwork and tearing down the existing swimming pool facility. It will be built on two floors and contain a 25 meter pool with six swimming lanes, a training pool with a height adjustable bottom and personnel space.The project is a traditional contract with some turnkey contract parts. The building will correspond to the level of Miljöbyggnad Silver. Construction will start in February 2023 and occupation is planned for 2025.