The team building Dogger Bank Wind Farm has officially marked the start of its offshore construction work with the installation of the first length of HVDC export cable off the Yorkshire coast. Tier one supplier NKT is leading the work to install the Dogger Bank A nearshore cable, that will connect the first phase of the windfarm more than 130km off the coast to a landfall point at Ulrome, in East Riding of Yorkshire. Aberdeenshire-based ACE Winches and LMR Drilling UK Ltd of Birkenhead are among the companies supporting NKT with this work.The campaign will continue during 2022, with work starting on the export cables for Dogger Bank B in East Riding, and Dogger Bank C on Teesside, in the consecutive years.Dogger Bank Wind Farm will be the first HVDC connected wind farm in the UK, paving the way for other UK wind farms and suppliers to build on our experience transmitting renewable energy safely and efficiently across long distances while minimising potential losses.The 3.6GW Dogger Bank Wind Farm will be the world’s largest offshore wind farm when completed in 2026. A joint venture project between SSE Renewables (40%), Equinor (40%) and Eni Plenitude (20%), SSE Renewables is leading the development and construction of Dogger Bank Wind Farm. Equinor will be lead operator of the wind farm on completion for its expected operational life of around 35 years.
The team building Dogger Bank Wind Farm has officially marked the start of its offshore construction work with the installation of the first length of HVDC export cable off the Yorkshire coast. Tier one supplier NKT is leading the work to install the Dogger Bank A nearshore cable, that will connect the first phase of the windfarm more than 130km off the coast to a landfall point at Ulrome, in East Riding of Yorkshire. Aberdeenshire-based ACE Winches and LMR Drilling UK Ltd of Birkenhead are among the companies supporting NKT with this work.The campaign will continue during 2022, with work starting on the export cables for Dogger Bank B in East Riding, and Dogger Bank C on Teesside, in the consecutive years.Dogger Bank Wind Farm will be the first HVDC connected wind farm in the UK, paving the way for other UK wind farms and suppliers to build on our experience transmitting renewable energy safely and efficiently across long distances while minimising potential losses.The 3.6GW Dogger Bank Wind Farm will be the world’s largest offshore wind farm when completed in 2026. A joint venture project between SSE Renewables (40%), Equinor (40%) and Eni Plenitude (20%), SSE Renewables is leading the development and construction of Dogger Bank Wind Farm. Equinor will be lead operator of the wind farm on completion for its expected operational life of around 35 years.