Galliford Try’s Environment business has been selected by Scottish Water, once again, to carry out works on its behalf through a place on lot 2 of Delivery Vehicle 2. The framework, worth up to GBP 350 million to Galliford Try over six years, will be delivered through its Scottish business Morrison Construction, with extension options of up to six years. The appointment represents another strategic win with a key client and will cover planned civil engineering projects between GBP 250,000 and GBP 1.5 millio including pipelaying, drainage and capital maintenance of Scottish Water assets. They will be carried out over the SR21-26 Investment period with a possible extension into the SR27 investment period. The appointment closely follows Galliford Try’s appointment to Scottish Water’s new Non-Infrastructure Framework for the SR21-27 investment programme, valued at GBP 700 million over a six-year timeframe.
Galliford Try’s Environment business has been selected by Scottish Water, once again, to carry out works on its behalf through a place on lot 2 of Delivery Vehicle 2. The framework, worth up to GBP 350 million to Galliford Try over six years, will be delivered through its Scottish business Morrison Construction, with extension options of up to six years. The appointment represents another strategic win with a key client and will cover planned civil engineering projects between GBP 250,000 and GBP 1.5 millio including pipelaying, drainage and capital maintenance of Scottish Water assets. They will be carried out over the SR21-26 Investment period with a possible extension into the SR27 investment period. The appointment closely follows Galliford Try’s appointment to Scottish Water’s new Non-Infrastructure Framework for the SR21-27 investment programme, valued at GBP 700 million over a six-year timeframe.