Blue Thunder Mining Initial Drill Results at Fancamp
Blue Thunder

Blue Thunder Mining Initial Drill Results at Fancamp

Blue Thunder Mining Inc has provided additional surface channel sampling results and initial diamond drilling results from the 2020 exploration program at its

51,000-hectare Muus Gold Project located near Chibougamau in QC. The Project comprises five non-contiguous claim blocks Fancamp, Muus, Muus East, Nisk and Embry.

At Fancamp, additional trenching results have continued to be very encouraging, intersecting as high as 12.37 grams per tonne gold over 3.0 metres, including 22.99 g/t Au over 1.0 m and 6.23 g/t Au over 2.0 m, including 9.64 g/t Au over 1.0 m. Although the vast majority of results from the Fancamp diamond drilling program are pending, initial analytical results from hole FAN 20-02 returned as high as 4.73 g/t Au over 1.0 m.

Trenching and drill results to date provide further evidence that there are multiple, subparallel gold mineralized structures that form part of a 25 to 75 m wide, north to north-east trending "corridor of veins" that extend for more than two kilometres. Within this corridor there are up to six mineralized structures, each spaced approximately 15 to 30 metres apart.

Related Stories

SteelGuru Business News
www.steelguru.com