Granada Gold Mine Drilling Update

Granada Gold Mine Inc has provided an update on its on-going drill program at Granada. This contains drill results from the 100-series part 2, near-surface drill
Granada Gold Mine Drilling Update
Granada Gold MineGranada Gold Mine

Granada Gold Mine Inc has provided an update on its on-going drill program at Granada. This contains drill results from the 100-series part 2, near-surface drill program targeting Vein 1.

Highlights:

2.39 g/t gold over 29m in hole GR-20-111 from 0.0 to 29.0m

7.72 g/t gold over 4.5m in hole GR-20-112 from 31.0 to 35.5m

7.29 g/t gold over 5.02m in hole GR-20-117 from 49.21 to 54.23m

The Company has now drilled a total of 9321.38 meters of the drill program (as of December 15th, 2020) of the current 12,000-meter program with 2 drills turning on site. This release represents 457 m of the program.

The 100-series holes were drilled to intersect the vein extension uncovered by stripping and to follow the high-grade corridor. Holes GR-20-111 to GR-20-113 are drilled within the vein structure. Holes GR-20-114 to GR-20-117 are vertical holes drilled to intersect the mineralized vein structures. Typical true thickness of the number 1 vein is 1.5 to 6 meters. The halo effect around vein 1 has been measured up to 20 meters true thickness with numerous mineralized veinlets hosting native gold. It has been estimated, based on metallurgical testing, that close to 50 percent of the gold is in native form and will be recovered from these veinlets.

Related Stories

SteelGuru Business News
www.steelguru.com