New Excavator Launched at Mikhailovsky GOK
Mikhailovsky GOKMetalloinvest

New Excavator Launched at Mikhailovsky GOK

A new 20 cubic metre excavator capable of producing 270,000 tonnes of iron ore per month has been launched into operation at Metalloinvest’s Andrey Varichev

A new 20 cubic metre excavator capable of producing 270,000 tonnes of iron ore per month has been launched into operation at Metalloinvest’s Andrey Varichev Mikhailovsky GOK. The equipment has been purchased as part of Metalloinvest’s mining complex development programme. The excavator produced at Uralmashzavod is now the third with this bucket volume at the enterprise, though the new model has a number of additional features.

The mine management specialists took the initiative to make important improvements to the excavator’s design during its installation: the body was reinforced with additional brackets, and the undercarriage was raised to prevent the tracks from touching the side of the machine. All this will ensure the smooth operation of the excavator and will increase its service life.

The new equipment meets all safety requirements: the excavator is equipped with side view cameras, the seat in the cab is installed with air suspension in order to reduce the impact from vibrations, and there is a climate control and noise reduction system in place.

The modernisation of the mining and transportation division’s fleet is one of the key aspects of Metalloinvest's investment programme. This year, Mikhailovsky GOK received two BelAZ dump trucks with a lifting capacity of 220 tonnes, two BelAZ dump trucks with a lifting capacity of 240 tonnes, a WK-35 excavator with a bucket volume of 25 cubic metres and a TEM-18 diesel locomotive.

No stories found.
SteelGuru Business News
www.steelguru.com