Palladium One Mining Step Out Hole Yields Highest Grades at Kaukua
Palladium One Mining LK Project

Palladium One Mining Step Out Hole Yields Highest Grades at Kaukua

Hole LK20-016 has the best combination of grade and width of all the results from the LK Project to date, said Palladium One Mining Inc. Located 1,350 m east of the

most westerly hole in Kaukua South, LK20-016 starting at only 23.5 m down hole, returned 62.7 m at 3.52 g/t of palladium equivalent, including 18.5 m at 4.58 g/t Pd_Eq.

Key highlights:

In Hole LK20-016, the core interval of 18.5 m at 4.58 g/t Pd_Eq starts near surface at 47.5 m down hole.

Hole LK20-019 started in mineralization and hit 35.0 m at 2.76 g/t Pd_Eq and also started near surface after 17.3 m of overburden.

Holes LK20-016 and LK20-019 are located 750 m east of hole LK20-006 (see news release dated August 11, 2020), which returned 166.7 m at 1.16 g/t Pd_Eq, including a core zone of 63.4 m at 1.88 g/t Pd_Eq.

Holes LK20-016 and LK20-019 are 1,350 m east of hole KAU-08-035, which returned a core zone of 33.0 m at 1.90 g/t Pd_Eq.

Continuity between holes LK20-006 and LK20-016 demonstrates potential to rapidly add ounces, providing the opportunity to significantly increase the existing NI 43-101 Kaukua open pit resource.

All holes drilled in the Kaukua South Extension have returned PGE-Ni-Cu mineralization and are open along strike and at depth.

Palladium One has now confirmed PGE-Ni-Cu mineralization over 4 km of strike length at the Kaukua South zone and the zone remains open laterally for expansion both to the east and west, as well as depth

Related Stories

SteelGuru Business News
www.steelguru.com