Three huge industrial boilers designed by John Cockerill left on 20 June 2022 the port of Cadiz in Spain where they have been pre-assembled. This pre-assembly earns them the name of plug & play boilers and this allows simpler and faster erection on site. These behemoths of 10,000 cubic meters and 1,000 tonnes each will be installed in a refinery in Scotland. John Cockerill’s technology will ensure better process profitability and will generate less CO2 and less nitrogen oxide.
Three huge industrial boilers designed by John Cockerill left on 20 June 2022 the port of Cadiz in Spain where they have been pre-assembled. This pre-assembly earns them the name of plug & play boilers and this allows simpler and faster erection on site. These behemoths of 10,000 cubic meters and 1,000 tonnes each will be installed in a refinery in Scotland. John Cockerill’s technology will ensure better process profitability and will generate less CO2 and less nitrogen oxide.