PETRONAS announced that the Gumusut-Kakap Phase 3 deepwater development project, off the coast of Sabah in Malaysia has achieved its first oil production on 31 July 2022. Two new oil producer wells and two water injector wells were drilled. Once fully completed in Q1 2023, the four wells will add around 25,000 barrels per day to GK’s existing production capacity. Sabah Shell Petroleum is the operator of the GK project, in partnership with PETRONAS Carigali, ConocoPhilips Sabah Limited, PTT Exploration and Production Public Company Limited, and PT Pertamina Malaysia Eksplorasi Produksi.
PETRONAS announced that the Gumusut-Kakap Phase 3 deepwater development project, off the coast of Sabah in Malaysia has achieved its first oil production on 31 July 2022. Two new oil producer wells and two water injector wells were drilled. Once fully completed in Q1 2023, the four wells will add around 25,000 barrels per day to GK’s existing production capacity. Sabah Shell Petroleum is the operator of the GK project, in partnership with PETRONAS Carigali, ConocoPhilips Sabah Limited, PTT Exploration and Production Public Company Limited, and PT Pertamina Malaysia Eksplorasi Produksi.