TotalEnergies, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency announced the start of production of CLOV Phase 2, a project connected to the existing CLOV FPSO (Floating Production, Storage and Offloading unit). This tie-back project will reach a production of 40,000 barrels of oil equivalent per day in mid-2022.Located about 140 kilometers from the Angolan coast, in water depths from 1,100 to 1,400 meters, the CLOV Phase 2 resources are estimated at around 55 million barrels of oil equivalent. Launched in 2018, this project was carried out within budget and planned execution duration, despite the challenges associated with the Covid-19 pandemic.Block 17 is operated by TotalEnergies with a 38% stake, alongside Equinor (22.16%), ExxonMobil (19%), BP Exploration Angola Ltd (15.84%) and Sonangol P&P (5%). The Contractor Group operates four FPSOs in the main production areas of the block, namely Girassol, Dalia, Pazflor and CLOV.
TotalEnergies, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency announced the start of production of CLOV Phase 2, a project connected to the existing CLOV FPSO (Floating Production, Storage and Offloading unit). This tie-back project will reach a production of 40,000 barrels of oil equivalent per day in mid-2022.Located about 140 kilometers from the Angolan coast, in water depths from 1,100 to 1,400 meters, the CLOV Phase 2 resources are estimated at around 55 million barrels of oil equivalent. Launched in 2018, this project was carried out within budget and planned execution duration, despite the challenges associated with the Covid-19 pandemic.Block 17 is operated by TotalEnergies with a 38% stake, alongside Equinor (22.16%), ExxonMobil (19%), BP Exploration Angola Ltd (15.84%) and Sonangol P&P (5%). The Contractor Group operates four FPSOs in the main production areas of the block, namely Girassol, Dalia, Pazflor and CLOV.