1414 Degrees Operational Update on GAS-TESS

1414 Degrees reported that its GAS-TESS has been successfully recommissioned in preparation for power export to the grid. It was heated to
1414 Degrees Operational Update on GAS-TESS
1414 Degrees

operating temperature and the turbine was run ready for verification testing and witnessing by SA Power Networks. This is expected to occur in late November when the Glenelg Wastewater Treatment Plant is scheduled to begin generating electricity from its gas engines, solar PV and the GAS-TESS to enable export to the National Electricity Market.

In preparation for the SAPN testing and verification SA Water required all generation devices to be integrated into an upgraded plant control system.

Related Stories

SteelGuru Business News
www.steelguru.com