Equipment for Kudankulam NPP Sailed to India

On December 29, 2020 the marine vessel COMBI DOCK I with equipment for Kudankulam NPP, the twenty-second and twenty-third batches of equipment,
Equipment for Kudankulam NPP Sailed to India
Kudankulam NPPET Energy

On December 29, 2020 the marine vessel COMBI DOCK I with equipment for Kudankulam NPP, the twenty-second and twenty-third batches of equipment, sailed to India. This shipment of unprecedented volume, 9503 cubic meters, includes the equipment indented for Kudankulam NPP Units 3 and 4. Long manufacture cycle equipment for Unit 3 includes load and service trolleys that are parts of the polar crane; equipment for Unit 4 includes transportation lock; equipment intended for both Units includes heat exchangers and locks, air systems of passive heat removal system (PHRS) and fuel pond racks. Among other equipment for both Units are pumps, valves, tanks, pipelines, metal doors, electrical connection modules, filters, evaporation plant equipment, low voltage complete devices cabinets.The estimated time of arrival in India is the third decade of January 2021.

Related Stories

SteelGuru Business News
www.steelguru.com