Nordex Bags Order for 302 MW from USA

The Nordex Group has received another large order for the N149/4.0-4.5 from the Delta4000 series. A wind farm developer has placed an order with the
Nordex Bags Order for 302 MW from USA
Nordex Bags

Nordex Group for 63 turbines for a project in the United States. The project and customer are undisclosed.

In the summer of 2021 the Nordex Group will be starting to deliver and install the turbines for this project in the state of Texas. The turbines are to be supplied in a project-specific operating mode of 4.8 MW, resulting in a total output for the wind farm of 302.4 MW.

Related Stories

SteelGuru Business News
www.steelguru.com