Polish Wind Energia has placed an order with the Nordex Group for the supply and installation of 16 N117/3000 turbines for the 48 MW Nozdrzec wind farm. The company is a subsidiary of Yevuley Shemesh YVS Renewable Energy, which operates in the field of renewable energy and is based in Israel. The order also includes a Premium Service for the turbines covering a period of 20 years.The “Nozdrzec” wind farm is being built in the south-east of Poland in the province of Subcarpathia. The N117/3000 turbines will be installed by the Nordex Group as of summer 2023 on tubular steel towers with a hub height of 134 metres. The final turbine is scheduled to go into operation at the end of 2023.
Polish Wind Energia has placed an order with the Nordex Group for the supply and installation of 16 N117/3000 turbines for the 48 MW Nozdrzec wind farm. The company is a subsidiary of Yevuley Shemesh YVS Renewable Energy, which operates in the field of renewable energy and is based in Israel. The order also includes a Premium Service for the turbines covering a period of 20 years.The “Nozdrzec” wind farm is being built in the south-east of Poland in the province of Subcarpathia. The N117/3000 turbines will be installed by the Nordex Group as of summer 2023 on tubular steel towers with a hub height of 134 metres. The final turbine is scheduled to go into operation at the end of 2023.