TVEL Fuel Company of ROSATOM has dispatched all shipments to China scheduled for 2022, in order to supply the first core loading of the CFR-600 fast-neutron reactor. In total, three batches of nuclear fuel, including all fuel assemblies for the first core loading as well as the bundles for the first refueling, have been sent by rail from the Elemash Machine-Building Plant in Elektrostal (an enterprise of Rosatom's TVEL Fuel Company). Along with that, reactor control and protection assemblies have been delivered to China by air.The facility for uranium CFR-600 fuel fabrication at the Elemash plant was launched in 2021. The enterprise had provided a fundamental modernization of the fast reactor fuel fabrication shop-floor, some examples of unique equipment had been developed and installed onsite. In late 2021, the mock-ups of control and protection system assemblies for CFR-600 were shipped to the Customer for testing of the simulation reactor core.The CFR-600 fuel contract was signed in compliance of the agreement between the Government of the Russian Federation and the Government of the People’s Republic of China. It is a part of a large-scale program of bilateral cooperation in nuclear industry for the decades ahead. In particular, the agreement covers construction of innovative power units of the Russian design (generation III +) with VVER-1200 reactors at two sites in China - Tianwan NPP and Xudabao NPP. The package of intergovernmental documents and framework contracts for these projects was signed in 2018, in presence of the heads of the two states.
TVEL Fuel Company of ROSATOM has dispatched all shipments to China scheduled for 2022, in order to supply the first core loading of the CFR-600 fast-neutron reactor. In total, three batches of nuclear fuel, including all fuel assemblies for the first core loading as well as the bundles for the first refueling, have been sent by rail from the Elemash Machine-Building Plant in Elektrostal (an enterprise of Rosatom's TVEL Fuel Company). Along with that, reactor control and protection assemblies have been delivered to China by air.The facility for uranium CFR-600 fuel fabrication at the Elemash plant was launched in 2021. The enterprise had provided a fundamental modernization of the fast reactor fuel fabrication shop-floor, some examples of unique equipment had been developed and installed onsite. In late 2021, the mock-ups of control and protection system assemblies for CFR-600 were shipped to the Customer for testing of the simulation reactor core.The CFR-600 fuel contract was signed in compliance of the agreement between the Government of the Russian Federation and the Government of the People’s Republic of China. It is a part of a large-scale program of bilateral cooperation in nuclear industry for the decades ahead. In particular, the agreement covers construction of innovative power units of the Russian design (generation III +) with VVER-1200 reactors at two sites in China - Tianwan NPP and Xudabao NPP. The package of intergovernmental documents and framework contracts for these projects was signed in 2018, in presence of the heads of the two states.