Russian nuclear giant ROSATOM announced that the Stavropol Krai-based Berestovskaya Wind Farm began to supply electric power and capacity to the wholesale electricity and capacity market on 1 January 2023. With an installed capacity of 60 MW, the wind power station consists of 24 wind turbines. As confirmed by the Russian Ministry of Industry and Trade, 68% of the wind farm equipment is sourced locally.NovaWind is ROSATOM's wind power division consolidating efforts of the Russian nuclear corporation in advanced areas of the energy generation technology. Established in September 2017, the company accumulates ROSATOM’s competencies in wind power generation, from design and construction to mechanical engineering and operation of wind farms. As of today, NovaWind has commissioned 780 MW of wind power capacity. By 2027, ROSATOM will put a total of about 1.7 GW of wind capacity in operation.
Russian nuclear giant ROSATOM announced that the Stavropol Krai-based Berestovskaya Wind Farm began to supply electric power and capacity to the wholesale electricity and capacity market on 1 January 2023. With an installed capacity of 60 MW, the wind power station consists of 24 wind turbines. As confirmed by the Russian Ministry of Industry and Trade, 68% of the wind farm equipment is sourced locally.NovaWind is ROSATOM's wind power division consolidating efforts of the Russian nuclear corporation in advanced areas of the energy generation technology. Established in September 2017, the company accumulates ROSATOM’s competencies in wind power generation, from design and construction to mechanical engineering and operation of wind farms. As of today, NovaWind has commissioned 780 MW of wind power capacity. By 2027, ROSATOM will put a total of about 1.7 GW of wind capacity in operation.