Port Authority of Valencia has approved the award of the contract to the joint venture made up of Lantania SAU and Tecmo Instalaciones for 16 EUR million for the construction and maintenance of this photovoltaic installation. This plant will generate over 9,000 MWh per year, which represents approximately 11% of the electrical energy consumption of the Port of Valencia.It is in addition to the project for the Muelle Príncipe Felipe dock which has already been awarded. Between the two installations, 14% of the electrical energy required by the Port of Valencia will be produced. A percentage which will increase considerably with the forthcoming solar park projects for the Port of Valencia.This project is financed by the Next Generation funds of the European Union and the Spanish Government’s Recovery, Transformation and Resilience Plan.The Port of Gandia’s solar plant to be located in shed 4 has also been awarded
Port Authority of Valencia has approved the award of the contract to the joint venture made up of Lantania SAU and Tecmo Instalaciones for 16 EUR million for the construction and maintenance of this photovoltaic installation. This plant will generate over 9,000 MWh per year, which represents approximately 11% of the electrical energy consumption of the Port of Valencia.It is in addition to the project for the Muelle Príncipe Felipe dock which has already been awarded. Between the two installations, 14% of the electrical energy required by the Port of Valencia will be produced. A percentage which will increase considerably with the forthcoming solar park projects for the Port of Valencia.This project is financed by the Next Generation funds of the European Union and the Spanish Government’s Recovery, Transformation and Resilience Plan.The Port of Gandia’s solar plant to be located in shed 4 has also been awarded