Representatives of the Robe River Joint Venture partners, Rio Tinto, Mitsui and Nippon Steel, gathered on 26 October in Perth to celebrate the 50-year anniversary of the venture’s first shipment of iron ore from the Pilbara to Japan. The celebration marked 50 years since the Fujisan Maru departed Cape Lambert on 5 October, 1972, and set sail to Japan loaded with 68,589 tonnes of iron ore. Since then, the Robe River Joint Venture has shipped more than 1.7 billion tonnes of iron ore. Robe River is a joint venture between Rio Tinto (53 per cent), Mitsui Iron Ore Development (33 per cent), and Nippon Steel . (14 per cent). Operations began in the Robe Valley, near Pannawonica, in 1972 followed by an expansion at West Angelas in 2002. Iron ore is railed to the port of Cape Lambert where lump and fines product is shipped to steel producers, primarily throughout Asia.
Representatives of the Robe River Joint Venture partners, Rio Tinto, Mitsui and Nippon Steel, gathered on 26 October in Perth to celebrate the 50-year anniversary of the venture’s first shipment of iron ore from the Pilbara to Japan. The celebration marked 50 years since the Fujisan Maru departed Cape Lambert on 5 October, 1972, and set sail to Japan loaded with 68,589 tonnes of iron ore. Since then, the Robe River Joint Venture has shipped more than 1.7 billion tonnes of iron ore. Robe River is a joint venture between Rio Tinto (53 per cent), Mitsui Iron Ore Development (33 per cent), and Nippon Steel . (14 per cent). Operations began in the Robe Valley, near Pannawonica, in 1972 followed by an expansion at West Angelas in 2002. Iron ore is railed to the port of Cape Lambert where lump and fines product is shipped to steel producers, primarily throughout Asia.