The Mumbai Metropolitan Region Development Authority has recently opened the financial bids for 60E1 (UIC-60), 1080 Grade Head Hardened Rails as per IRS T-12 supply contract package CA-150 for Corridor 4, Bhakti Park-Kasavadavali 32.32 km, & 4A, Kasaravadavli-Gaimukh, 2.88 km, of Mumbai Metro Rail Project and Jindal Steel & Power Ltd has emerged as the preferred bidder for supply 9800 tonnes of head-hardened rails. JSPL has quoted INR 110.3 million to win this contract package. Only two bidders JSPL and Mitsui & Co had submitted their bids. The 60E1 - 1080 grade head-hardened rails is manufactured through a special heat treatment process to provide additional strength, lower residual stress, and elongate track-life and minimize maintenance.
The Mumbai Metropolitan Region Development Authority has recently opened the financial bids for 60E1 (UIC-60), 1080 Grade Head Hardened Rails as per IRS T-12 supply contract package CA-150 for Corridor 4, Bhakti Park-Kasavadavali 32.32 km, & 4A, Kasaravadavli-Gaimukh, 2.88 km, of Mumbai Metro Rail Project and Jindal Steel & Power Ltd has emerged as the preferred bidder for supply 9800 tonnes of head-hardened rails. JSPL has quoted INR 110.3 million to win this contract package. Only two bidders JSPL and Mitsui & Co had submitted their bids. The 60E1 - 1080 grade head-hardened rails is manufactured through a special heat treatment process to provide additional strength, lower residual stress, and elongate track-life and minimize maintenance.