South Korean steelmaker POSCO has resumed operations at Hot Strip Mill No 2 in Pohang after a three-month-long suspension due to a typhoon, bringing the number of normalized plants to 13 out of 18 plants following the natural disaster. HSM 2 processes 5 million tonnes or 33% of 14.8 million tonnes of steel products at Pohan plant. POSCO plans to bring the remaining five plants, including the No 1 and No 2 cold-rolled stainless steel mills and the No 1 electrical steel mill, back to normal by the end of January
South Korean steelmaker POSCO has resumed operations at Hot Strip Mill No 2 in Pohang after a three-month-long suspension due to a typhoon, bringing the number of normalized plants to 13 out of 18 plants following the natural disaster. HSM 2 processes 5 million tonnes or 33% of 14.8 million tonnes of steel products at Pohan plant. POSCO plans to bring the remaining five plants, including the No 1 and No 2 cold-rolled stainless steel mills and the No 1 electrical steel mill, back to normal by the end of January