Tenova has received a new contract for the supply of a Decarburization and Coating Line from NLMK Group’s VIZ-Stal for its plant in Ekaterinburg in Russia. The contract was awarded through its company Essen Germany based industrial furnace plants supplier Tenova LOI Thermprocess. This new line will provide one of the important stages of grain oriented electrical strip production; steel final processing will be carried out at a newly-built plant located in India. The contract includes the engineering, the supply and the supervision services of the mechanical and process equipment, the heat treatment portion (furnace system) as well as the related electrical, measuring and control systems for a Decarburization and Coating Line. NLMK Group’s General Director of Silicon Production Mr Valery Shevelev said "NLMK selected Tenova on the basis of the large number of references for similar heat treatment lines. The short execution time is another important factor that led us to choose Tenova as partner for this project. The DCL Line is scheduled to start production by the end of 2021.”
Tenova has received a new contract for the supply of a Decarburization and Coating Line from NLMK Group’s VIZ-Stal for its plant in Ekaterinburg in Russia. The contract was awarded through its company Essen Germany based industrial furnace plants supplier Tenova LOI Thermprocess. This new line will provide one of the important stages of grain oriented electrical strip production; steel final processing will be carried out at a newly-built plant located in India. The contract includes the engineering, the supply and the supervision services of the mechanical and process equipment, the heat treatment portion (furnace system) as well as the related electrical, measuring and control systems for a Decarburization and Coating Line. NLMK Group’s General Director of Silicon Production Mr Valery Shevelev said "NLMK selected Tenova on the basis of the large number of references for similar heat treatment lines. The short execution time is another important factor that led us to choose Tenova as partner for this project. The DCL Line is scheduled to start production by the end of 2021.”